I'm a little late on the build thread, as our pool is probably only about 3 weeks away from completion - but I wanted to document it anyway, and I'm certain there will still be many questions to ask. Our vision for our first pool is clean lines, simple, contemporary style that's practical for our family with 3 kiddos under 10.. We went with a level zero edge spa (7'x7') and a 5' wide sun ledge, and lots of bench seating in the pool. We're also adding a free-standing pergola (14'x18') and an outdoor kitchen area (gas griddle, kamado joe grill, refrigerator) on the existing patio. Landscaping to follow... We interviewed 4 different PBs, but it was fairly straight forward because we had a very good idea of what we wanted, so it made comparing easy. Like many others, we found most of the PBs resistant to SWG, but I made it clear that was something we wanted.
Size: 33'x21.5'
Depth: 3.5' to 6'
Volume: 17K gal
Coping: Pre-cast concrete (Stone Creek pavers - thanks TFP!)
Plaster: PebbleSheen Blue Granite (?)
Water features: 3 bubblers on ledge, 60" Sheer on raised wall
Decking: Rock salt finished concrete
Tile: Charcoal porcelain tile on waterline and raised wall; glacier glass tile on spa spillway
Equipment:
Pump: Intelliflo VSF - 011056
Heater: MasterTemp 400 - 460736
Automation: Intellicenter w SWG IC40, i8PS - 521903
Sanitation: IC40, plus BioShield
Aux Pump: Whisperflo - 11774
Lighting: 3 Intellibrite 5G (2 pool, 1 spa) + 2 Microbrite (1 on ledge, 1 on uplight bench to light sheer)
Filter: Clean and Clear Plus 520 - 160332
Pre-Filter: WaterCo MultiCyclone 16
Spa blower: Jandy PSB215
Robot: TBD - leaning towards S200
Dig day was on a Tuesday, followed by rebar on Wednesday, inspection and plumbing stub-out Thursday, then gunite on Friday! It was intense those first few days. The next week was plumbing and electrical, then tile the following week. In the meantime the kitchen structure was built and posts were set for the pergola. Then we hit the Christmas/New Year break and waited on the coping to show up - which was today. Coping should finish tomorrow, then we will be ready for deck forming and drainage layout later this week. Overall, I've been very happy thus far with the PB and their management of our project. So excited to see this coming together!
A few pictures...








Size: 33'x21.5'
Depth: 3.5' to 6'
Volume: 17K gal
Coping: Pre-cast concrete (Stone Creek pavers - thanks TFP!)
Plaster: PebbleSheen Blue Granite (?)
Water features: 3 bubblers on ledge, 60" Sheer on raised wall
Decking: Rock salt finished concrete
Tile: Charcoal porcelain tile on waterline and raised wall; glacier glass tile on spa spillway
Equipment:
Pump: Intelliflo VSF - 011056
Heater: MasterTemp 400 - 460736
Automation: Intellicenter w SWG IC40, i8PS - 521903
Sanitation: IC40, plus BioShield
Aux Pump: Whisperflo - 11774
Lighting: 3 Intellibrite 5G (2 pool, 1 spa) + 2 Microbrite (1 on ledge, 1 on uplight bench to light sheer)
Filter: Clean and Clear Plus 520 - 160332
Pre-Filter: WaterCo MultiCyclone 16
Spa blower: Jandy PSB215
Robot: TBD - leaning towards S200
Dig day was on a Tuesday, followed by rebar on Wednesday, inspection and plumbing stub-out Thursday, then gunite on Friday! It was intense those first few days. The next week was plumbing and electrical, then tile the following week. In the meantime the kitchen structure was built and posts were set for the pergola. Then we hit the Christmas/New Year break and waited on the coping to show up - which was today. Coping should finish tomorrow, then we will be ready for deck forming and drainage layout later this week. Overall, I've been very happy thus far with the PB and their management of our project. So excited to see this coming together!