That is a good last pic! Really shows the rock.
When do you get home?
Kim![]()
Now it is time for you to do your "job"...........go out with a measuring tape......is it wide, deep, long, etc enough? Add about 6" for the gunite and plaster.
The area that I really want you to look at is the lazy river.....once the gunite and plaster is added to both side (spa and pool wall) it looks like it might be kind of narrow. How much open are were your aiming for? Me? I would have it wide enough to ride a circle float through. NOW is the time to fix/tweak as needed/wanted.
Kim![]()
Good job on the measuring there. It will be easy for them to fix. Time but easy. Push to get what you want!
Kim![]()
DUDE! You got a good one in the PB! Oh wait..........is there going to be an up charge for these changes HE made??? Oh and on the "fixing the rebar"----trust yet verify" to the max. He means to do it but the workers may forget so..........
Kim![]()