We've been dealing with wet weather and scheduling delays, but we finally got all of the stone and tile work finished and had the decking poured on Thursday. Clean up crew came out yesterday and cleaned and graded the work site, and threw out a layer of sand. We should be on the home stretch at this point, just need our cool deck and plaster. Given the upcoming holidays and our travel plans those are going to be pushed back until after Thanksgiving.
I did order and receive my TF-100 test kit and ran a set of tests on our tap water. Based on what I've read, all the numbers seem to fall in the normal range:
FC-0.5
CC-0.5
TC-1.0
pH-7.7
CH-150
TA-210
I've started looking into pool robots, and talked to Margaret at Marina Pools last week. After doing some research, I think I'll be pulling the trigger on the Dolphin M400 here pretty soon. Given the number of benches, stairs, and bar stools, along with our deep end and size of the pool, Margaret thinks we'd be better suited with one of the premium line of robots. Any feedback on this robot would be great.