NEW build in PA !!

61 degrees but we jumped in!

15a44054fbc1ba73c4ca9afc3735bf0e.jpg
 
Finally finished! 13 months after breaking ground! Thanks to 2 bad winters here. Worth the wait though!

The builder is still running the chemicals at this point. We only filled it up 7 days ago so no heater and no SWG yet. No robot vacuum. Lots and lots of brushing the wet edge pebble.
7b1644a198b0bed084b0d87f36a9cb62.jpg
 
The thing I like best about your pool design is that there isn't a straight line to be seen anywhere. Everything is fluid (no pun intended) and relaxed. Even your concrete control seams have motion. Love it. We're going after the same feel with our build.
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.