Some activity today. Tiling work is finished and rough electrical is complete. They also drained the pool. Installed the waterfall and plumbed it. Contact with my PB has been difficult(now that he has 70% of his money) so I'm not sure what the schedule moving forward is. Originally Plaster was this Friday but I doubt that happens.