After two days of working and reworking the design, it is mostly ready to go for Tuesday's pour. It rained overnight though and we have found a bit of a drainage issue and now are trying to decide the best fix for it. It may be more channel drains combined with a french drain. Landscaper and irrigation guy are meeting with us on Wednesday for final decisions. It was torture not to be able to use the pool int he 90 degree heat the last few days, but hopefully soon!