I recently had our pool and adjacent patio renovated recently and I am wondering how much vertical movement in the first 6 months to 1 year can be typically expected with a new travertine paver patio that was dryset ?
Currently the installation is approximately 3 months old and there have been a lot of the pavers moving 1/8" to 1/4" vertically. It just seems like there should not be this much movement with a new paver installation.
Let me know what you think. TIA