I probably know the answer, but I just thought I'd check.
The IC60 cell indicates water must flow from the bottom to the top. The only possible location on my plumbing is a vertical section where the water flow from top to bottom. That means the IC60 controls will be upside down and the cord will stick out the top. That will drive me bonkers forever. I looked through the manual but didn't see any way to handle that situation.
Am I stuck pulling my hair out every time I look at the cell or adjust it, or is there something I can do to allow me to install it right-side up aside from replumbing (which isn't even a possibility because of the configuration of my pad)?
The IC60 cell indicates water must flow from the bottom to the top. The only possible location on my plumbing is a vertical section where the water flow from top to bottom. That means the IC60 controls will be upside down and the cord will stick out the top. That will drive me bonkers forever. I looked through the manual but didn't see any way to handle that situation.
Am I stuck pulling my hair out every time I look at the cell or adjust it, or is there something I can do to allow me to install it right-side up aside from replumbing (which isn't even a possibility because of the configuration of my pad)?