So we broke ground on Feb 3rd for a free form pool with an 8’ deep end. Its 37’ long 18’ wide and an 8’ diameter hot tub. Its not the end of May and were not done yet. It seema like my contractor shows up and does a few things like once a week and then we dont see him again for a week to 10 days.
The hole is dug, the pool cemented, pipes and electrical is run, the surrounding cement and overhang it done and the tile is laid. Were supposed to have equipment installed this week and then mini-pebble sprayed but I still feel there are other things to be done. Is 4 months or more reasonable AND why such long delays between doing some work?
The hole is dug, the pool cemented, pipes and electrical is run, the surrounding cement and overhang it done and the tile is laid. Were supposed to have equipment installed this week and then mini-pebble sprayed but I still feel there are other things to be done. Is 4 months or more reasonable AND why such long delays between doing some work?