I am in the process of opening my pool which became overrun with algae over the winter.
We have gotten our CYA levels in check (they were too highdue to trusting test strips. Won’t do that again!)
Now we are working on pH. And will SLAM once that is where it needs to be.
Currently:
TA=130
pH=7.6
Calculator says 1 gallon plus 1 quart will get us down to 7.
Plan is to add 1/2 gallon and test.
How long after adding the acid should I wait to test? (And almost certainly add more.)
Thank you!
We have gotten our CYA levels in check (they were too highdue to trusting test strips. Won’t do that again!)
Now we are working on pH. And will SLAM once that is where it needs to be.
Currently:
TA=130
pH=7.6
Calculator says 1 gallon plus 1 quart will get us down to 7.
Plan is to add 1/2 gallon and test.
How long after adding the acid should I wait to test? (And almost certainly add more.)
Thank you!