Hi there,
Just started my first (and hopefully only) SLAM process.
Before I started,
FC = ~0
pH = 8.0
CYA = ~40
with target of 16 for FC.
I added muriatic acid to lower pH (about 30 oz), waited a few hours and added 3 gallons of liquid chlorine (@10%). It has been about four hours since I added the liquid chlorine and I just tested,
FC is ~6.0 (using Taylor SpeedStir)
pH is ~7.6.
Question: How long does the liquid chlorine concentration take to dissipate and peak? I am trying to figure out if I need to add more liquid chlorine now (ie we have peaked and are far from our goal of 16) or wait until tomorrow to remeasure FC.
Thanks in advance.
Just started my first (and hopefully only) SLAM process.
Before I started,
FC = ~0
pH = 8.0
CYA = ~40
with target of 16 for FC.
I added muriatic acid to lower pH (about 30 oz), waited a few hours and added 3 gallons of liquid chlorine (@10%). It has been about four hours since I added the liquid chlorine and I just tested,
FC is ~6.0 (using Taylor SpeedStir)
pH is ~7.6.
Question: How long does the liquid chlorine concentration take to dissipate and peak? I am trying to figure out if I need to add more liquid chlorine now (ie we have peaked and are far from our goal of 16) or wait until tomorrow to remeasure FC.
Thanks in advance.