I have an Autopilot RC-42 doing about 1.52 output per day.
I also have a ~42,000 - 45,000 gallon pool. I'm not quite sure because checking between schematics and actual pool there's some slight differences but this measurement has been what I've successfully used for chemistry.
I completed SLAM and now am letting FC levels drop from 30 -> 8. I'm noticing I'm losing somewhere around. 3 - 4 ppm FC a day. But how am I supposed to replace that much FC if my SWG produces such little chlorine? If I use the pool math calculator at 4 hours I'll have raised FC by 0.8. With 8 hours it's 1.5. I don't see how apart from running the SWG 24/7 I will match the FC loss. So does the FC loss come down the closer it gets to the level the CYA can support?
I started with a CYA of 0 pre-SLAM and have worked up to 50 CYA. I'm hesitant to get to 70 too quick but have the CYA ready to be added slowly over the course of 2 weeks because the CYA takes 48 hours to properly adjust.
This is my 2nd year with the pool and I FINALLY found the source of my algae and repeated SLAM, so I want to do this absolutely right and never worry about this pool again.
Test Results:
FC: 17.5->16.5ish overnight, I say ish because it's slightly higher than 16.5 as there's a tiny bit of pink left
Alkalinity: 70
pH: 7.6 Pre-slam, havent checked lately
CYA: 0 pre-slam, currently 50
Thanks
I also have a ~42,000 - 45,000 gallon pool. I'm not quite sure because checking between schematics and actual pool there's some slight differences but this measurement has been what I've successfully used for chemistry.
I completed SLAM and now am letting FC levels drop from 30 -> 8. I'm noticing I'm losing somewhere around. 3 - 4 ppm FC a day. But how am I supposed to replace that much FC if my SWG produces such little chlorine? If I use the pool math calculator at 4 hours I'll have raised FC by 0.8. With 8 hours it's 1.5. I don't see how apart from running the SWG 24/7 I will match the FC loss. So does the FC loss come down the closer it gets to the level the CYA can support?
I started with a CYA of 0 pre-SLAM and have worked up to 50 CYA. I'm hesitant to get to 70 too quick but have the CYA ready to be added slowly over the course of 2 weeks because the CYA takes 48 hours to properly adjust.
This is my 2nd year with the pool and I FINALLY found the source of my algae and repeated SLAM, so I want to do this absolutely right and never worry about this pool again.
Test Results:
FC: 17.5->16.5ish overnight, I say ish because it's slightly higher than 16.5 as there's a tiny bit of pink left
Alkalinity: 70
pH: 7.6 Pre-slam, havent checked lately
CYA: 0 pre-slam, currently 50
Thanks