Okay, just got the hand-off today from the PB. Using test strips
rolleyes
, they think everything is peachy. I'm of course skeptical. My readings with a TF100:
FC: .5
pH: 8.4
TA: 60
CH: 350
CYA: 0
CSI: .58
The pool has been operational for about two weeks. Salted and the SWG has been on for about that same duration. Here in So Arizona the pool temp has remained around 60F without the heater and that is where I expect it to stay for a few months (with occasional heating up of the spa.)
Pool Math is showing me what I need to add, my question is if I should do all the additives (muriatic acid, etc) at the same time or is it better to add the various chemicals over a period of days to see a better "cause & effect" from each one?
Thanks!
Kurt
FC: .5
pH: 8.4
TA: 60
CH: 350
CYA: 0
CSI: .58
The pool has been operational for about two weeks. Salted and the SWG has been on for about that same duration. Here in So Arizona the pool temp has remained around 60F without the heater and that is where I expect it to stay for a few months (with occasional heating up of the spa.)
Pool Math is showing me what I need to add, my question is if I should do all the additives (muriatic acid, etc) at the same time or is it better to add the various chemicals over a period of days to see a better "cause & effect" from each one?
Thanks!
Kurt