Hi all,
Putting up an all resin 27' diameter circular pool. Using a unibead liner with J-hook install.
I've gone over directions several times and still not clear on when to fill the up the pool up with water.
Once the wall is up with sand, cove, gorilla pad, etc and liner goes in, do I fill pool up all the way to bottom of the skimmer opening before installing uprights?
Or do I get the wrinkles out of the liner, fill it up 4-6", then install the uprights, top rail, etc., then fill rest of the way?
Thanks!
Putting up an all resin 27' diameter circular pool. Using a unibead liner with J-hook install.
I've gone over directions several times and still not clear on when to fill the up the pool up with water.
Once the wall is up with sand, cove, gorilla pad, etc and liner goes in, do I fill pool up all the way to bottom of the skimmer opening before installing uprights?
Or do I get the wrinkles out of the liner, fill it up 4-6", then install the uprights, top rail, etc., then fill rest of the way?
Thanks!