I started another thread here because our pool is finished. Everything is going. Finished my wiring and today one of the installers came to collect all their things and he said "we are done, we don't program automation systems, I recommend watching youtube". We were told when the pool was sold that they will be here until the end to show us everything and get it up and going as it should and now they are leaving high and dry. This is likely because we bought the PL-Plus from another company due to the price being much cheaper and now they don't want to help us program it. They didn't even show us how to test the water, just said to bring in a sample at the end of the week.
The pool is 29,000 gallon, vinyl, hayward 400k propane, filter, Hayward VSP 1.65 THP, T-cell-15, with 2" PVC plumbing, and chlorine generator set to 50% for now until I can test it.
I need to program the pump settings to run every day, but I am not sure how long it should run, and at what speed. Also, when the pool calls for heat, it should turn on the pump also, correct?
Also, shouldn't the pool always be pumping so that the skimmer is always moving water or does it only do that when it runs on its scheduled time?
Thanks so much for all your advice.
The pool is 29,000 gallon, vinyl, hayward 400k propane, filter, Hayward VSP 1.65 THP, T-cell-15, with 2" PVC plumbing, and chlorine generator set to 50% for now until I can test it.
I need to program the pump settings to run every day, but I am not sure how long it should run, and at what speed. Also, when the pool calls for heat, it should turn on the pump also, correct?
Also, shouldn't the pool always be pumping so that the skimmer is always moving water or does it only do that when it runs on its scheduled time?
Thanks so much for all your advice.