We recently purchased a new home/pool with sky high CYA. I emptied the pool this last weekend and completed a chlorine wash and power wash to the entire surface. I also cleaned and soaked the 4 cartridges in a TSP solution. I started filling the pool today (from homes city water) at a rate of 96 gallons per 13 minutes and expect it to take around 40-45 hours. We have a very odd shape pool and I want to get as close of an accurate volume level as possible.
Just in case my pool info is not present: Inground, pebbletec, apr 20k-25k volume?, Jandy Filter CL460, Jandy Main 1.5 main pump (second pump for waterfall), Taylor K2006 (with newbie using it)
The water is crystal clear
I have about 1,600 gallons in the pool so far and just completed a water test with these results using the Taylor 2006 kit.
FC - 0 (I added scoop after scoop and had almost no change after 10 scoops at the 25mml level)
CC - .06 (liquid turned clear after third drop)
I am a little concerned i made an error with the FC and CC since I could not get the color to change with the powder and didn't want to waste the entire container.
PH - 7.2
TA - 40
CH - 120
CYA - 0 (following the directions and adding the water into the small vile the black dot always was as clear as day)
Since the pool will take about 2 days to fill any suggestion on where to start with chemicals when I should start up the pumps etc. would be fabulous.
Just in case my pool info is not present: Inground, pebbletec, apr 20k-25k volume?, Jandy Filter CL460, Jandy Main 1.5 main pump (second pump for waterfall), Taylor K2006 (with newbie using it)
The water is crystal clear
I have about 1,600 gallons in the pool so far and just completed a water test with these results using the Taylor 2006 kit.
FC - 0 (I added scoop after scoop and had almost no change after 10 scoops at the 25mml level)
CC - .06 (liquid turned clear after third drop)
I am a little concerned i made an error with the FC and CC since I could not get the color to change with the powder and didn't want to waste the entire container.
PH - 7.2
TA - 40
CH - 120
CYA - 0 (following the directions and adding the water into the small vile the black dot always was as clear as day)
Since the pool will take about 2 days to fill any suggestion on where to start with chemicals when I should start up the pumps etc. would be fabulous.