Gunite After Cave In and Repair

Reynolds_pool

Member
May 29, 2023
11
Charlotte, NC
Our dig was complete, rebar put down, and our inspection with the county was completed. That was great until Mother Nature rained for days. PB had rebar team come out today to do repairs. The deep end is still very wet and we noticed that due to mud, there is not space between rebar and dirt or mud in some areas. Is that a problem? PB has Gunite scheduled for tomorrow afternoon. Is this okay for Gunite application?
 

Attachments

  • IMG_1245.jpeg
    IMG_1245.jpeg
    830.7 KB · Views: 95
  • IMG_1247.jpeg
    IMG_1247.jpeg
    874.1 KB · Views: 93
  • IMG_1246.jpeg
    IMG_1246.jpeg
    742.8 KB · Views: 93
  • IMG_1248.jpeg
    IMG_1248.jpeg
    803.6 KB · Views: 91
Do not let them pour unless......
Yes that is a problem and the pb would have to get rid of the earth that is there now since the rebar needs to be in the middle of the pour and not half inch.
 
I am hopeful that the gunite crew will remove all the dirt.

I'd be taking a sick day today to make sure. Are you feeling OK? You don't look so good. ;)
 
  • Like
Reactions: Lanzz
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.