Hey guys,
Long time lurker, always found the answers using a search so never needed to post. LOVE the TFP method of maintenance.
Our SummerWaves pool lasted a few years and finally bit the dust last year so we went with a hard side option this time
We went with a Contempra 24’ pool from poolfactory (not sure if links are allowed). The ground prep is making my head spin. We initially wanted to follow the manual, instructions attached. The whole 2” deep x 2ft’ perimeter of rock dust, set the rails down then throw 2” sand in middle is what’s tripping me up. Obviously they want the rail and legs well supported but how do we keep the perimeter contained to 2ft without going into the interior of the pool? Is there an easier method to this madness that is still going to give the proper support so the pool can last a long time?
Thank you x10000!
Long time lurker, always found the answers using a search so never needed to post. LOVE the TFP method of maintenance.
Our SummerWaves pool lasted a few years and finally bit the dust last year so we went with a hard side option this time
We went with a Contempra 24’ pool from poolfactory (not sure if links are allowed). The ground prep is making my head spin. We initially wanted to follow the manual, instructions attached. The whole 2” deep x 2ft’ perimeter of rock dust, set the rails down then throw 2” sand in middle is what’s tripping me up. Obviously they want the rail and legs well supported but how do we keep the perimeter contained to 2ft without going into the interior of the pool? Is there an easier method to this madness that is still going to give the proper support so the pool can last a long time?
Thank you x10000!