May 5th, signed Contract
May 25th permits approved
July 18th Dig
July 26th Gunite
Plumbing August 8th
Equipment August 30th
Electrical September 5th
Tile/Coping and Masonry scheduled for this Monday. We were really hoping for this recent Tuesday but because we're using Glass Tile, they had to wait for their glass tile guy and they didn't want to start coping until tile is in.
So we're at 9 weeks from Dig so far.
They are saying it should only take about 7 days to do the tile/coping/masonry.
My grill/cabinet, etc comes Monday as well so in truth good timing.
Just tired of no yard at all, dog tired of it too. Up until Electrical we had the entire North side of backyard and side of house for her. But when they did electrical they had to trench from north side all the way around house to the south side to our equipment pad, thus a giant ditch and preventing any use of the gate on that side of the house. Also not a good safe way to get there off the back porch with the trench.
Ready to have it done. LOL
All our patio furniture is here but they are holding it at warehouse at NFM for us because I have nowhere to put it until everything is done.
We're very hopeful it's all finished by October 20th weekend because we're having a large family gathering with Inlaws, Brother in law - his wife- child, etc.