I put in a single 2" pipe before backfilling. More pipes might have been a good idea.
Having struggled with the rebar loops and pouring concrete through the small gaps in the deck, and then reading that, were I to do it over I'd cut more of the deck out and put an expansion joint between the deck and the concrete around the skimmer.
Saw cut a caulk a joint.