My father in law and myself will do the pool deck after the PB is done with the shell. I have to look at the contract and talk to the PB to ascertain what they will bond. Let’s assume they will bond everything but deck, even the initial ring immediately around the pool. 2 sides of my pool closer to the house will be pavers and the 2 others will be bare grass for the time being. The grass sides of the pool are actually bordering an easement which prevents me from building anything permanent. Will the second 8 gauge ring at about 2ft suffice for both the pavers and grass? Should I try to do copper mesh on paver side and ring on the grass? Thanks for the info both what would be safest and meets code