DIY Fiberglass Pool Advice

Just an update. The new PB is moving very fast! The pool shell has already been levelled and walls straightened. They are now almost done with the plumbing. They are using rigid schedule 40 pvc, 1.5". I'm making them do a pressure test before burying the lines. He said they will do a leak test with water, not air.

Here is how we ended up placing the returns, skimmer, and lights (note: the drains were already in place from the previous PB). The drains are on a seperate run than the skimmer.
 

Attachments

  • Pool Location 2.png
    Pool Location 2.png
    59.8 KB · Views: 12
  • Like
Reactions: Newdude
Looks good buddy! So glad to hear the new pool builder is moving along and you'll have an operational pool very soon!!!
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.