Hello!
I am a new pool owner here in the hot AZ desert and have been doing my own maintenance with good results so far. We filled the 9000 gallon pool in early July and so far about 16 Tri-Chlor pucks and maybe 5-6 bags of the 13oz shock have been added. I took a sample to my local pool supply shop and they advised that the CYA level is at 100. Now I have read that their CYA readings can be off so I ordered my own test kit. While I wait, I’m wondering about how long should it take to get to the point where a pool my size would need to be (partially) drained and refilled? Thanks in advance!
I am a new pool owner here in the hot AZ desert and have been doing my own maintenance with good results so far. We filled the 9000 gallon pool in early July and so far about 16 Tri-Chlor pucks and maybe 5-6 bags of the 13oz shock have been added. I took a sample to my local pool supply shop and they advised that the CYA level is at 100. Now I have read that their CYA readings can be off so I ordered my own test kit. While I wait, I’m wondering about how long should it take to get to the point where a pool my size would need to be (partially) drained and refilled? Thanks in advance!