continue using PB included chemicals or not?

hartpump

Well-known member
Apr 19, 2021
51
Clinton, Ohio
Pool Size
17000
Surface
Plaster
Ok so Thanks to everyone who helped me get started. I have a pretty good handle on my numbers.
FC - 6.5
pH - 7.6
TA - 100
CH - 425
CYA - 70
Salt 3650
Temp around 80 most of the time.
I am still struggling to get the TA to 90. I have lowered pH with HCL and Aerated several times.
Now that I am fully on board with the TFP method, should I continue to use up the rest of the stuff the PB gave me at start up? Meaning just because I already paid for them.
I attached pics. I bought CYA so I don't need to rely on the diclor for it so I will assume I should never need to add it as long as the SWG is functioning properly.
As always thanks for your help.
 

Attachments

  • IMG_0748.JPEG
    IMG_0748.JPEG
    399.7 KB · Views: 13
  • IMG_0751.JPEG
    IMG_0751.JPEG
    246 KB · Views: 13
The dichlor could be used at start up in the spring when you need CYA and chlorine.

The stain stuff does not hurt anything. The polyquat 60 you can use at closing.

The cover free scam and the clarifier can be disposed of.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.