Hi All,
I am adding a SWG and need to connect it to the existing bonding wires. Since I am touching anyway, I am going to replace the existing bonding wire that connects my Pump, Heater, and SPA aerator. (Wire then runs underground so I am hopefully assuming it connects to decking rebar and pool lights but who knows). I have new copper lugs, new 8 awg bare wire and new screws. I’m ready to roll!
I noticed that the Intermatic timer and its housing are not connected to the bonding wire. Should they be connected since it is metal and near the other mechanicals? (Yes, they are grounded, I am fairly confident that I understand the difference between grounding and bonding, based on all of the other helpful TFP posts!!).
Also, is there any way to check that the existing bonding connects to the pool lights or decking rebar??
36k gallon, plaster pool.
Mike
I am adding a SWG and need to connect it to the existing bonding wires. Since I am touching anyway, I am going to replace the existing bonding wire that connects my Pump, Heater, and SPA aerator. (Wire then runs underground so I am hopefully assuming it connects to decking rebar and pool lights but who knows). I have new copper lugs, new 8 awg bare wire and new screws. I’m ready to roll!
I noticed that the Intermatic timer and its housing are not connected to the bonding wire. Should they be connected since it is metal and near the other mechanicals? (Yes, they are grounded, I am fairly confident that I understand the difference between grounding and bonding, based on all of the other helpful TFP posts!!).
Also, is there any way to check that the existing bonding connects to the pool lights or decking rebar??
36k gallon, plaster pool.
Mike
Last edited: