When I purchased this house and the pool, the electrical at the pool equipment was set up Rear follows:
Old school Intermatic Timer
Pump wired onto the terminals of the timer for power.
I am have an electrician do some work in the house and while he was there I was going to add an outlet the SWG. He looked he said that's not proper. You should power an outdoor 220v outlet from the timer and plug in the pump and SWG to that outlet.
Does that sound right?
Old school Intermatic Timer
Pump wired onto the terminals of the timer for power.
I am have an electrician do some work in the house and while he was there I was going to add an outlet the SWG. He looked he said that's not proper. You should power an outdoor 220v outlet from the timer and plug in the pump and SWG to that outlet.
Does that sound right?