Hello all,
I going to be installing a vinyl liner pool with travertine coping and pool decking. If the backfill is 3/4” stone. Do I still have to put down a concrete slab for the travertine to lay on? Or can I backfill with dirt and have a lift every 12” then 4-6” of stone, then the slab topped off with the travertine?
So many decisions and I’m grateful to have a community like TFP.
Joe
I going to be installing a vinyl liner pool with travertine coping and pool decking. If the backfill is 3/4” stone. Do I still have to put down a concrete slab for the travertine to lay on? Or can I backfill with dirt and have a lift every 12” then 4-6” of stone, then the slab topped off with the travertine?
So many decisions and I’m grateful to have a community like TFP.
Joe