Hi all, we have met with several PBs and have narrowed it too two. Here are both proposals. One PB uses Jandy equipment the other Hayward but also notes Jandy never lube valves. We tried to get the design to match to be easier to compare. The one using Hayward is giving us a larger pool for a bit less $$$. We are not comfortable with the payment schedule for either and will be asking to change that (see final payment).
Could you please comment on the details below? Is there anything we missed? It’s such an overwhelming process but we are excited to get started and have a pool for our little ones. Summers in TX have not been kind. TIA
Could you please comment on the details below? Is there anything we missed? It’s such an overwhelming process but we are excited to get started and have a pool for our little ones. Summers in TX have not been kind. TIA
PB#1 | PB #2 | |
Geometric pool with sunshelf | Geometric pool with sunshelf | |
33.5 L * 11.5 width | 39 L *11 width | |
99 sqft perimeter | 109 sqft perimeter | |
11K gallons | 13K gallons | |
21 feet raised wall length , 18’ H | 22 feet raised wall length , 18’ H | |
12 inch thick floor, 6-8 walls | #3 3/8 Rebar in walls and Floors tied on 8" Centers, 12" box beam #4 rebar | |
2 skimmers | 2 skimmers | |
2.5 inch suction, 2inch returns | 2.5 inch suction, 2inch returns (6 minimum) | |
Equipment | Equipment | |
1 valves/ check valves/autofill/ main drain ( 1 a&a long drain) | Dual suction channel drain (VGB compliant), 3/4" Pool Automatic Fill Line with PVB Backflow Device, Jandy 2" never lube valves, overflow drain 2" tied into drainage, | |
1 surge protector | ||
Aqualink pd6 | Vs Omni / App Control | |
Filter cv460 | C4030 (Cartridge Filter) | |
1 rainbow chlorinator | ||
1 jandy salt cell plc-1400 apurem power center | Aqua Rite (Salt) | |
Polaris/tr-28 ( I will remove this) | ||
1 jxi 400k btu heater | H-Series 400,000 BTU | |
Provision for chiller/pad | ||
1 epump variable speed 2.7hp | Tristar 950 Vs Epump | |
Actuator for bubbler and sheer descent | Tristar 900 Vs Epump (for sheer descent, will replace with actuator) | |
2 jandy watercolor led pool lights | 2 Hayward UCL LED Pool Lights | |
1 bubbler | Removed bubblers | |
1 4’ sheer descent | 1 4’ sheer descent | |
Electrical includes sub panel | Electrical includes sub panel, 360 Degree Earth Ground at Steal of Pool Beam | |
Pebble finish level I | Pebble finish level I | |
Drains per linear feet to street/ drains under deck | Drains per linear feet to street | |
Travertine Decking/coping, porcelain on wall | Travertine Decking/coping, porcelain on wall | |
Payment schedule | Payment schedule | |
$5000 deposit | $1,500.00 Deposit | |
20% Due Before Excavation | 30% Due on or Before Excavation | |
50% Due before Gunite | 40% Due on or before day of Gunite | |
20% Due day of decking | 20% Due on or Before Decking Begins | |
10% Due day of Plaster | 10% Due on or before day of Plaster |