I have to close my pool tomorrow. It has been scheduled for months and I have roofers waiting to start putting on a new roof. They preferred the pool covered. I can't reschedule the closing because they loaded the roof today and are ready to go.
The problem I have is that it has been pouring for three days and will continue through tomorrow. We are under extreme flood warnings. I have had to drain water twice a day for the last three days. I have no idea where my chemicals are and I can't clean the pool properly and my liner likes to float when we get this much rain.
I have been running my robot all day and my plan is to try to get some chlorine and PH readings this afternoon. I raised my CYA up to 60 about six weeks ago so I am going to bring to SLAM level for CYA of 50. After the rain passes I will siphon the water back down to closing level.
I think I have a solid plan and I have closed enough times but I need some reassurance I haven't overlooked anything.
Thnx, Chris
The problem I have is that it has been pouring for three days and will continue through tomorrow. We are under extreme flood warnings. I have had to drain water twice a day for the last three days. I have no idea where my chemicals are and I can't clean the pool properly and my liner likes to float when we get this much rain.
I have been running my robot all day and my plan is to try to get some chlorine and PH readings this afternoon. I raised my CYA up to 60 about six weeks ago so I am going to bring to SLAM level for CYA of 50. After the rain passes I will siphon the water back down to closing level.
I think I have a solid plan and I have closed enough times but I need some reassurance I haven't overlooked anything.
Thnx, Chris