Of course it’s a Friday and my pool builder is not reachable. They left after the shell was shot. When I looked out, I see that it had been completely covered with fairly thick plastic sheeting. I don’t know if this is this is Visquene or not. Doesn’t matter I guess. So I went out to peek under to see what the steps look like and a blast of air so hot. It was like opening my oven on Thanksgiving after cooking the turkey for three hours. It looked like the surface of the concrete was already getting dry looking. Then it did rain a little, which is why I think they put it on to begin with so now I have a small little lake inside the plastic sitting on top of the new shell. And when I say New, I mean this afternoon new. So am I irrationally concerned about the extremely hot temperature under the plastic? Any advice would be appreciated since I can’t get a hold of my contractor. Also, he did say that we could walk around in there if we wanted over the weekend because many people do that and also that if it rained that would be good because I asked about watering it and he didn’t think it mattered one way or the other. Any info appreciated.