Hi there,
When my AGP was installed, we did the bonding to code with the assumption that we would use the PVC ladder that came with our pool. Since then we built a little deck and got an over-the-side ladder that has stainless steel uprights and PVC steps.
I assume I must now include this in the bonding loop, is there a simple way to do this?
Thanks!
When my AGP was installed, we did the bonding to code with the assumption that we would use the PVC ladder that came with our pool. Since then we built a little deck and got an over-the-side ladder that has stainless steel uprights and PVC steps.
I assume I must now include this in the bonding loop, is there a simple way to do this?
Thanks!