New homeowner here and trying to figure out my pool programming. I have a Pentair EasyTouch panel (with ScreenLogic) with IntelliFlo pump. I'm trying to figure out the proper way to set up schedules.
Goal is to do this:
7:30AM to 8:00AM Run Spillway at 2200RPM
8:00AM to 3:30PM Circulate/Filter the Pool at 2700RPM
3:30PM to 4:00PM Run Spillway at 2200RPM
What's the proper way to set up this schedule? I currently have the below circuits:
Pool (Pool) 400RPM
Pool Circ (Generic) 2700RPM
Spillway (Spillway) 2200RPM
Spa (Spa) 3450RPM
I can create the 3 above schedules easily on ScreenLogic but should I also be adding a schedule to have the Pool run from 7:30AM to 4:00PM? And one thing I noticed is that if I have NO schedules active and turn on the Spillway, the Pool function turns on automatically, is this normal?
Thanks in advance!
Goal is to do this:
7:30AM to 8:00AM Run Spillway at 2200RPM
8:00AM to 3:30PM Circulate/Filter the Pool at 2700RPM
3:30PM to 4:00PM Run Spillway at 2200RPM
What's the proper way to set up this schedule? I currently have the below circuits:
Pool (Pool) 400RPM
Pool Circ (Generic) 2700RPM
Spillway (Spillway) 2200RPM
Spa (Spa) 3450RPM
I can create the 3 above schedules easily on ScreenLogic but should I also be adding a schedule to have the Pool run from 7:30AM to 4:00PM? And one thing I noticed is that if I have NO schedules active and turn on the Spillway, the Pool function turns on automatically, is this normal?
Thanks in advance!