I used the sock method to add CYA granules (a little over 5lbs split between 4 socks, attached to empty jugs and positioned in front of the return) It's taking foreverrrr, almost 24hrs and still 2 socks to go. I still have to add phosphate remover and salt. I can now see since the water os a little more clear, where I missed some spots and need to vacuum. My questions are:
Do I need to wait until all the CYA is dissolved before adding phosphate remover? And where in between these steps would be best to vacuum, or can I do it now, while waiting on the CYA? Kids are tapping their feet while staring out the window, wishing Mama would have gotten to this sooner, lol!!
(14,000 gal above ground with a saltwater sand filter)
Thanks!!
Do I need to wait until all the CYA is dissolved before adding phosphate remover? And where in between these steps would be best to vacuum, or can I do it now, while waiting on the CYA? Kids are tapping their feet while staring out the window, wishing Mama would have gotten to this sooner, lol!!
(14,000 gal above ground with a saltwater sand filter)
Thanks!!