Nothing is in balance yet. I am in process of "non drain water exchange". But my empty rate (flow out) with the superior sump pump and a 100 foot 5/8 inch hose is 5 gallons a minute. To exchange 20,000 g it will take me 4000 minutes. 4000/1440 min in day. About 3 days.If the ph, TA, FC/CYA are all in balance grab the kids and throw them in!
I could cut the time as follows: I could safely drain 10,000 gallons and only have to deal with 10,000 remnant gallons so I could cut the exchange process to 1.5 days. After that, my flow in could be adjusted from 5 g minute to 10 g minute so It would take me 1000 minutes or 17 hours to refill pool to original level. So roughly I could save a whole day. I am also trying to determine if the whiteish areas on bottom of pool are delamination or calcium deposits