Above Ground Pool Closing

Richardjoslin

Active member
May 20, 2015
34
Holliston, MA
Pool Size
14000
Surface
Vinyl
Chlorine
Liquid Chlorine
Hello.

I am reading the below article and it says to "Clean and brush pool. Bring pool water to “shock” level and maintained there for 24hrs with pump running to be sure that there are no remaining algae blooms."

What does it actually mean to bring pool water to shock level? Is that the same as SLAM?

Thanks

 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.