Understood. I'll look into it. For reference though, the pool is at the top of a hill. All gutters are fed into underground drainage pipes. And, the kooldeck is sloped away from the pool. We made sure of all that before we poured concrete. Ground is hard georgia clay, so it doesn't hold much...