Last fall, about a month before I closed the pool, I had a freak occurrence where apparently the insulation cracked on one or more wires running to my pool, and it shorted and melted all the wires. It's right at the pumping station where an elbow wasn't properly secured. Anyway, I'm replacing the conduit and wiring from there out. My plan is to put a C condulet in and splice all the wires in it, then rerun the new wires to their proper tie ins. The current wire is #12 solid. What's the general consensus on solid vs stranded? I plan on using a mechanical splice with shrink wrap on each connection.
Here's the makeshift connections I had to make to run the pump at the end of last season.
Sent from my iPhone using Tapatalk
Here's the makeshift connections I had to make to run the pump at the end of last season.

Sent from my iPhone using Tapatalk