Looking for a sanity check here. My plumbing and electrical layout seems me as though the “technicians” did everything they could to make this footprint as large as possible. No thought went into this whatsoever. Is there any reason why they didn’t take the electrical pvc all the way to the house? Why stop 15” short unless they were just too lazy to run another 90deg bend and dig a little more trench? Same with the plumbing. Zero consideration for trying to save space. I had planned to put a putting green on the side of the house but didn’t expect plumbing to come out 7ft from the wall. Are my expectations too high or does this look like something that needs to be fixed? Thanks for the help!