Move aside TX, CA and AZ! It's time for some midwest action. 
Pool company called. They will be out in 2-3 weeks to finalize pool size, bells & whistles and location.
Been waiting on the landscaper to draw up plans (for several months). We have been working with him on lots of stuff over the years so he's reliable. We have a weird backyard and need to scrape off the top 2-3 inches to level the ground. It's weird but we have a concrete step and we need to get rid of it before someone trips & gets injured.
We are #2 on the pool company's list. We decided early on in covid to put down a deposit. The dig starts February.
Will post plans when I get them! I'm, I mean "we're" so excited!

Pool company called. They will be out in 2-3 weeks to finalize pool size, bells & whistles and location.
Been waiting on the landscaper to draw up plans (for several months). We have been working with him on lots of stuff over the years so he's reliable. We have a weird backyard and need to scrape off the top 2-3 inches to level the ground. It's weird but we have a concrete step and we need to get rid of it before someone trips & gets injured.
We are #2 on the pool company's list. We decided early on in covid to put down a deposit. The dig starts February.
Will post plans when I get them! I'm, I mean "we're" so excited!