My PB installed a 3/4" overflow drain pipe, and I'm wondering if it's really large enough to be effective. For some reason, I expected the overflow to be 1.5" or even 2" piping. I asked the construction manager about it, and he said 3/4" is what is expected.
Does 3/4" seem reasonable, or should I just replace it myself with 1.5" or 2" piping before gunite is shot?