Here is the contract:
Dimensions of Pool: Width 20' and Length 40'
Area: 800 sq ft
Shape of Pool: Rectangle
Depth: 3'6" - 8' (a little different than your spec)
All Proposals and Designs are owned by XXXX Pool Builder and may only be distributed by XXXX Pool Builder or by written consent. Sharing our proposal and designs are strictly forbidden and unlawful. Please be respectful of the time and effort that we put into providing YOU a personal design and proposal. Do not provide this information to our competitors. This should not prohibit you from getting expert advice as I read it but you may want to get them to acknowledge that you may use their documents to assist in evaluation of their proposal and for 3rd party inspection
THIS AGREEMENT, between Contractor hereinafter referred to as "Seller" and "Buyer" (listed above), for the construction of a swimming pool and related equipment, agree that the terms and conditions listed on the bottom part of this agreement and that the writing contains the entire agreement between the Buyer and Seller, and further acknowledges that each of them has read and understood this entire contract, and has received a copy thereof, this contract may be amended by addendum, signed by any one of the buyers whose name appears below.
Pool to be completed approximately 90 working days after excavation under correct weather and working conditions. If other portions of the job that directly impact the ability of the pool to continue progress, then the 90 days will be re-evaluated. Excavation to begin within 5 days of the County permit approval and County initial Site Visit.
STANDARD CONSTRUCTION SPECIFICATIONS
1. Seller to supply pool plans, stake out pool on day of excavation (Buyer to approve pool, equipment location, and elevation) How long do you have for approvals that are required by you?
2. Seller to obtain STANDARD swimming pool construction permits for Buyer. Grading plan to be provided by other if needed What does this mean? Are you obligated to do this? If so could be extra cost... make sure to clarify
3. Access walls, obstructions, or fences to be removed by Seller, to be replaced by Buyer Get them to do this or make sure you know your costs and permits that may be required.
4. Tree removal is the responsibility of the Buyer and should be done prior to excavation day Wow! More potential for added costs. What about roots? This can be very expensive in some cases. Your lot looks clear but it also looks new and if original vegetation was trees there could be roots that interfere with excavation. Get clarification on this.
5. Excavation - Seller to excavate pool, hand shape and stock pile excess soil onsite day of excavation. Your PB has experience in your development. You should understand the potential extra costs he has experienced.
a. If upon excavation Seller finds tree stumps, Buyer will be notified of any potential extra costs to remove said tree stumps
6. A Standard Hydrostatic Control System shall be installed in all pools by Seller with relief plugs in deep and possible shallow ends
7. Steel Reinforcement to be structurally engineered to comply with (ASTM) No. A615. Steel structures to be bonded with #8 copper ground wire per National Electric Code
8. Pneumatically applied concrete shell (known as gunite or shotcrete) structurally engineered in accordance with the American Concrete Institute ACI-318 Standard "Building Code Requirements for Reinforced Concrete" designed to attain 4,000 PSI Compressive Strength at 28 days. The minimum thickness of the gunite is to be as follows: walls 6", floors 6", covers 8", and perimeter bond beam 14"
9. Seller to install 6" bank of Frost Proof waterline tile. Color and Choice to be selected by Buyer from Sellers selection. If glass is chosen, Buyer realizes that this is an Upgrade and a change order will be given Decide this prior to award
10. Seller to electrically bond entire steel reinforcing and equipment for the pool
11. Pool equipment to be installed on concrete pad near AC Units
12. Plumbing to include two (2) deluxe self-adjusting weir and leaf bucket included, Dual Anti-Vortex Main Drains that are VGBA Compliant
13. Seller to provide Buyer proof of insurance papers upon request Get yourself added with a "named insured certificate" from the insurer. This should be provided at no additional cost within 48 hrs of signing contract..
14. Seller will provide the Buyer with start up instructions, equipment checkout, and will put equipment into operation
15. Buyer is responsible for the filling of the swimming pool Get details on your obligation here make sure you can fulfil.
16. Interior Finish - Quartz Plaster
17. Winter Cover is included and will be installed after all final payments have been made
18. Boulders, Rocks, and Landscaping are not part of this package unless stated otherwise and are in the design for conception only.
19. This package does not include fencing
20. All proposals, 3D designs, and 3D videos are the copy righted property of XXXX Pool Builder and may not be shared without the consent of XXXX Pool Builder. Get consent for expert advice and your inspector.