New Build Frisco TX

Work Days 17-18 (actual days 26-27, 28(rain out)) weather has been less than desirable but they finished up the roof on the structure. Next up really will be the start of stonework. Maybe early next week.
 

Attachments

  • 67EEB4A3-BBCC-42B1-B5EB-6224329E49E5.jpeg
    67EEB4A3-BBCC-42B1-B5EB-6224329E49E5.jpeg
    470.4 KB · Views: 68
  • 4E13DD8D-5D7D-4476-8B91-C37396111AE5.jpeg
    4E13DD8D-5D7D-4476-8B91-C37396111AE5.jpeg
    671.9 KB · Views: 67
Work Day 21
Bring on the stone work!
 

Attachments

  • F9B72ACF-B6F5-4EE4-8B24-299C5F6B3830.jpeg
    F9B72ACF-B6F5-4EE4-8B24-299C5F6B3830.jpeg
    789.2 KB · Views: 39
  • 524A821B-67EC-407B-9436-00430E061FEA.jpeg
    524A821B-67EC-407B-9436-00430E061FEA.jpeg
    643 KB · Views: 42
  • 46C8BF22-39CA-4A40-9D36-C7A84BCAC63D.jpeg
    46C8BF22-39CA-4A40-9D36-C7A84BCAC63D.jpeg
    338.6 KB · Views: 40
Work Day 22
More stonework and a wall in the pit.
 

Attachments

  • 8DD204B7-508C-450D-8794-4ECF988F5CF3.jpeg
    8DD204B7-508C-450D-8794-4ECF988F5CF3.jpeg
    242.9 KB · Views: 50
  • 73579E9F-CF65-46E5-83A8-7E6C48794383.jpeg
    73579E9F-CF65-46E5-83A8-7E6C48794383.jpeg
    611.7 KB · Views: 67
  • C4CC89D7-5DD0-4DA1-B726-864F42C78A03.jpeg
    C4CC89D7-5DD0-4DA1-B726-864F42C78A03.jpeg
    727.5 KB · Views: 69
  • 47785334-5CC4-4C73-9600-019ED917E42B.jpeg
    47785334-5CC4-4C73-9600-019ED917E42B.jpeg
    707.7 KB · Views: 65

Enjoying this content?

Support TFP with a donation.

Give Support
Work Days 23-24. Stone cont... (Actual Days 35,38)
 

Attachments

  • 32A657DE-0982-4BCB-BFB5-3DF936EE0F74.jpeg
    32A657DE-0982-4BCB-BFB5-3DF936EE0F74.jpeg
    583.5 KB · Views: 43
  • 14693BDE-B8B7-484A-B53A-425E104AD435.jpeg
    14693BDE-B8B7-484A-B53A-425E104AD435.jpeg
    655.5 KB · Views: 44
  • D5B3905C-F2EF-4635-913B-D8CCA2DBA67E.jpeg
    D5B3905C-F2EF-4635-913B-D8CCA2DBA67E.jpeg
    681.6 KB · Views: 42
  • 7EFEC764-8EB8-4F4E-9059-0A80143E5DE7.jpeg
    7EFEC764-8EB8-4F4E-9059-0A80143E5DE7.jpeg
    745 KB · Views: 43
  • 2EA1E0FA-1055-4C0D-92C6-0C4F4E268D5F.jpeg
    2EA1E0FA-1055-4C0D-92C6-0C4F4E268D5F.jpeg
    539.3 KB · Views: 43
  • 7D0CF55F-963A-4C82-86DE-5F4F32FBA143.jpeg
    7D0CF55F-963A-4C82-86DE-5F4F32FBA143.jpeg
    349.1 KB · Views: 46
  • 09A06A1F-D633-4D95-BD7A-40C5F213724B.jpeg
    09A06A1F-D633-4D95-BD7A-40C5F213724B.jpeg
    602.7 KB · Views: 46
Last edited:
Work Days 25-26 (Actual Days 39-40)
We have stairs, well almost.
 

Attachments

  • E0CB3A65-D025-45EE-8A55-816D0DC5FF57.jpeg
    E0CB3A65-D025-45EE-8A55-816D0DC5FF57.jpeg
    563.1 KB · Views: 44
  • 296BAFBB-9A8D-48A2-98F7-B7C9C61CCD50.jpeg
    296BAFBB-9A8D-48A2-98F7-B7C9C61CCD50.jpeg
    538.4 KB · Views: 45
  • C4A3AF4C-CA8A-45C9-873D-9F3FE0966DCA.jpeg
    C4A3AF4C-CA8A-45C9-873D-9F3FE0966DCA.jpeg
    575.3 KB · Views: 51
  • 65B419B7-D1A0-456D-BA67-EFFA07D23FE0.jpeg
    65B419B7-D1A0-456D-BA67-EFFA07D23FE0.jpeg
    484.7 KB · Views: 51
Work Day 27 (Actual 41)
Stairs finished, bar top laid out, and an electric pic.
 

Attachments

  • 922468CB-6ACE-4098-82B7-F4D38ABC66C1.jpeg
    922468CB-6ACE-4098-82B7-F4D38ABC66C1.jpeg
    690.5 KB · Views: 44
  • 098C56F9-EB01-45C0-9CC3-360573CE8592.jpeg
    098C56F9-EB01-45C0-9CC3-360573CE8592.jpeg
    668.9 KB · Views: 43
  • 901E444E-D17A-4E23-8C50-77A8FB5C76BB.jpeg
    901E444E-D17A-4E23-8C50-77A8FB5C76BB.jpeg
    684.7 KB · Views: 41

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.