Hi all, finally took the plunge and ordered my diy IG vinyl pool kit from Royal.
Location: Pittsburgh PA
Size: 18x36x26 L-shape
Wall height: 4' steel
Depth 4' to 8'
Personal background: Automation Engineer with four young kids. All boys. They will be my helpers on this project.
I will say my experience working with Royal was extremely pleasurable. My ordering process was probably unconventional, however the salesman was easy to work with through the entire process. To help trim some costs, he suggested I explore building my own full width steps and tanning ledge, which is the route I'm going. I was a bit shocked at how expensive the full width step kits were. As I'm doing the install on my own, I only initially ordered the bare minimum of what I needed to get started. I still don't have a lot of the major pieces figured out yet (pump,filter,heater,liner, etc), but I didn't want to delay getting the walls and coping forms ordered.
I picked up my permit from the township last week, they weren't too thrilled with my doing it on my own. I feel like the permit process will end up taking longer than the install itself.
I apologize, I will probably have a million questions that have already been asked, I'll try my best to search before asking.
Question #1: I have to approve the design/build drawing for the pool and I requested two cutouts on the panels for skimmers. Being that I have not ordered the skimmer boxes yet, am I going to run into issues where the hole they punched out isn't compatible with the skimmer box I order? Are skimmer box holes a standard size across the board? Or should I just tell them to not punch the holes for the skimmer just to be safe and handing cutting out once I determine which skimmers I'm buying?
Question #2: Being the pool I ordered is pretty bare bones, I don't think the locations for the skimmers is ideal for my end design. When they drafted this up, I dont think they knew that I was planning on making the bottom "L" portion of the pool a tanning ledge. Since I am doing that, it's probably not ideal to have the skimmer on the tanning ledge, right? If so, where would you recommend I have them relocate them to? It might all be a moot point, it looks like both skimmers are on 8' panels straight panels, which are interchangeable I'm guessing. Either way I need to get this figured out quick because I need to approve the print before it goes to fabrication.
Question #3: Similar to above, they proposed Q2 discharge returns on the drawing. I assuming I will want/need more. Should I just have them not drill for these and I can worry about that later? I plan on also adding two bubblers on the tanning ledge.
Question #4: I tried to do some research on this, but any good articles/videos on how to build your own steps and tanning ledge for a vinyl pool? I poked around and found a few different approaches that seemed to get the job done. Some used block and backfilled with gravel with a layer of concrete on the top, some built forms and did the entire thing with concrete. My FIL has experience with both block and concrete, he can give me a hand. I thought this video did a good job explaining how he does them.
Login to view embedded media
. Unfortunately not a ton of info on this topic. I wasn't about spending $4k for some sheet metal steps from Royal.
Appreciate the help!
-Kevin