If you are building your pool here are things to discuss with your builder and contractor.<ref>https://www.troublefreepool.com/threads/design-your-dream-pool-pad.184681/</ref>
 
If you are building your pool here are things to discuss with your builder and contractor.<ref>https://www.troublefreepool.com/threads/design-your-dream-pool-pad.184681/</ref>
  
 +
==Location==
 
*Consider location carefully. Many Pool Builders will put the equipment where it is convenient for them
 
*Consider location carefully. Many Pool Builders will put the equipment where it is convenient for them
 
*Size - 5’ x 10-12’+
 
*Size - 5’ x 10-12’+
Line 9: Line 10:
 
*Room to move around, put your feet between equipment, and get behind all equipment  
 
*Room to move around, put your feet between equipment, and get behind all equipment  
 
*Control panels on something solid like a structure wall or a wall created by posts and 2 x 10’s.
 
*Control panels on something solid like a structure wall or a wall created by posts and 2 x 10’s.
 +
==Ventilation and Sun Protection ==
 
*Good airflow
 
*Good airflow
 
*Consider where heater exhaust will blow to
 
*Consider where heater exhaust will blow to
 
*Protection from sun or at least spray paint pipes
 
*Protection from sun or at least spray paint pipes
 +
==Electrical==
 
*Light overhead for night work
 
*Light overhead for night work
 
*120V GFCI receptacle  
 
*120V GFCI receptacle  
 +
==Water==
 
*Water spigot
 
*Water spigot
 
*Drain area or to sewer for waste
 
*Drain area or to sewer for waste
 +
==Plumbing==
 +
*Valves-make sure they are the rebuildable ones-Jandy and Pentair make some good ones. Do NOT allow "ball valves" from the big box stores.
 +
*Unions-make sure they use these on all of the equipment so you can service it without having to cut the pipe
  
 
.
 
.

Revision as of 14:39, 14 September 2019

What are the Best Practices for a Pool Equipment Pad?

If you are building your pool here are things to discuss with your builder and contractor.[1]

Location

  • Consider location carefully. Many Pool Builders will put the equipment where it is convenient for them
  • Size - 5’ x 10-12’+
  • Pumps on one side, filter in the middle and heater on the other side.
  • No pipes coming up through concrete, bring them up through crushed stone.
  • All valves & pipes labeled for function and flow direction
  • Room to move around, put your feet between equipment, and get behind all equipment
  • Control panels on something solid like a structure wall or a wall created by posts and 2 x 10’s.

Ventilation and Sun Protection

  • Good airflow
  • Consider where heater exhaust will blow to
  • Protection from sun or at least spray paint pipes

Electrical

  • Light overhead for night work
  • 120V GFCI receptacle

Water

  • Water spigot
  • Drain area or to sewer for waste

Plumbing

  • Valves-make sure they are the rebuildable ones-Jandy and Pentair make some good ones. Do NOT allow "ball valves" from the big box stores.
  • Unions-make sure they use these on all of the equipment so you can service it without having to cut the pipe

.