- Sep 15, 2022
- 53
- Pool Size
- 15000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-40
DIRT TO STAY ON PROPERTY | ||||
1 | No dirt to remain on property | 0.00 | | 0.00 |
BASE PRICE | ||||
1 | Presidential Base Package - Tucson | 45,595.00 | | 45,595.00 |
1 | 15% Down Payment Progress Payments | 0.00 | | 0.00 |
JURISDICTION SURCHARGES (PERMITS STD. ENG. CODES) | ||||
1 | Mandatory Fuel Surcharge Fee | 500.00 | | 500.00 |
1 | Pima County | 1,015.00 | | 1,015.00 |
LAYOUT | ||||
1 | Layout | 0.00 | | 0.00 |
POOL SIZE AND DEPTH | ||||
102 | Pool Perimeter 75' Base included (Extra Charge for >75' and Credit given for < 75') Tucson | 0.00 | | 0.00 |
385 | Sq. Footage (1st 350' included in price) | 0.00 | | 0.00 |
27 | Perimeter greater than 75' per LF - Tucson | 235.05 | | 6,346.35 |
35 | Area Greater than 350' - Tucson | 55.10 | | 1,928.50 |
6 | Max Pool Depth (Up to 5' included in package) | 0.00 | | 0.00 |
1 | Max depth greater than 5' - Tucson | 2,175.00 | | 2,175.00 |
ACCESS/SCREEN WALLS | ||||
1 | Replace Tucson Pilaster, (each, Grey Block) | 532.15 | | 532.15 |
1 | Tuc. Hang Gate w/ Spring | 488.65 | | 488.65 |
EXCAVATION-BOBCAT/TRACK HOE | ||||
1 | Mini III Dig up to 350' SA (3'-6" up to 5'-5") | 3,625.00 | | 3,625.00 |
85 | Mini III Dig over 350' Surface Area add per SA foot | 7.25 | | 616.25 |
EXCAVATION | ||||
1 | Paver Addendum | 0.00 | | 0.00 |
1 | Pre Grade Done By Owner Amendment | 0.00 | | 0.00 |
1 | Oversize Second Step (per step) | 652.50 | | 652.50 |
PLUMBING | ||||
15 | Total Skimmer Run (15' Included) | 0.00 | | 0.00 |
35 | Total Lin. Feet Steps/Benches (35 Lin. Feet Included) | 0.00 | | 0.00 |
1 | AUTO Water Leveler, 1included | 0.00 | | 0.00 |
50 | Total Run AUTO Water Leveler, 1 (50 ft Included) | 0.00 | | 0.00 |
1 | Q-360 Ultimate In-floor System, (upgrade from Rebel, no surface returns) (1 Main Drain, 1 Leaf Canister Inc.) | 3,364.50 | | 3,364.50 |
7 | Additional Q360 Cleaning Heads | 283.37 | | 1,983.59 |
PUMPS | ||||
1 | Upgraded - IntelliFlo VSF Package (VST2/420 Cart) | 1,145.51 | | 1,145.51 |
ELECTRICAL & CONTROLLERS | ||||
75 | TOTAL 1/2 inch rigid conduit (1st 50 ft. included in price) | 0.00 | | 0.00 |
25 | 1/2 inch rigid conduit (over Included 50 FT.) - TUCSON | 13.59 | | 339.75 |
1 | Intermatic Enclosure w/Low Voltage Transformer (Included) | 0.00 | | 0.00 |
1 | IntelliCenter i5 w/integrated WiFi, no credit for T/C | 2,050.85 | | 2,050.85 |
1 | Add IC 40 Salt Cell | 1,492.60 | | 1,492.60 |
1 | Spectrum 360 Blue LED Pool light(s) 1 included in price | 0.00 | | 0.00 |
1 | Credit for Spectrum 360 White or Blue LED Pool/Spa light | -544.84 | | -544.84 |
2 | Multi-Color Spectrum. 360 Light, per light | 640.34 | | 1,280.68 |
70 | Total Run Pool Light Conduit Ft. - TUCSON | 11.45 | | 801.50 |
ACRYLIC/NAT. CONCRETE DECKING AND ARTIFICIAL TURF | ||||
450 | Tucson Acrylic Lace (1st 350 ' inc., there will be no credit for unused acrylic) | 0.00 | | 0.00 |
100 | Additional Acrylic Lace Deck greater than base allowance - Tucson | 16.80 | | 1,680.00 |
17 | Deck Drain for Concrete/Acrylic Decks only, per LF | 21.75 | | 369.75 |
16 | 18" Turndown, per LF | 43.50 | | 696.00 |
1 | Tucson Concrete Surcharge | 870.00 | | 870.00 |
1 | Tucson - Concrete Travel South of Grant | 217.50 | | 217.50 |
130 | Tucson - Acrylic Lace Over Existing Concrete, per SF | 5.61 | | 729.30 |
RAISED BOND BEAMS W/ TILE | ||||
23 | Tucson 18" Raised Bond Beam w/Tile LF | 155.30 | | 3,571.90 |
RAISED BOND BEAM UPGRADE/ EXTRAS | ||||
1 | Sleeves in Deck (volleyball/umbrella) | 73.95 | | 73.95 |
1 | Sleeves in Pool, steps or benches only, no in floor | 73.95 | | 73.95 |
1 | Credit 2 Sleeves | -147.90 | | -147.90 |
INTERIOR FINISH | ||||
861 | White Marble Plaster (1st 650 IA SF included in price) | 0.00 | | 0.00 |
211 | Interior Finish Greater than 650 IA SF | 6.16 | | 1,299.76 |
861 | Tucson Upgrade A Selections Pebble Radiance | 4.93 | | 4,244.73 |
INTERIOR FINISH COLOR SELECTION | ||||
1 IA | Pebble Radiance Color Selection A Group | 0.00 | | 0.00 |
TILE GROUP SELECTIONS | ||||
102 | 6" waterline tile (per foot), Perimeter included - TUCSON | 0.00 | | 0.00 |
SPA WITH POOL | ||||
1 | Spa, 5 Jets, 360 LED Light, Air Canister - TUCSON | 10,083.45 | | 10,083.45 |
25 | Spa Plumbing Total Run | 0.00 | | 0.00 |
10 | Spa Plumbing Run greater than 15' | 29.73 | | 297.30 |
1 | Spectrum 360 Blue LED Spa Light(s) | 0.00 | | 0.00 |
1 | Credit for Spectrum 360 White or Blue LED Pool/Spa light | -544.84 | | -544.84 |
35 ft | Total Spa Light Conduit Run - TUCSON | 10.15 | | 355.25 |
1 | Multi-Color Spectrum 360 Spa Light | 640.34 | | 640.34 |
1 | Upgrade Spa Interior to Pebble Radiance - TUCSON | 1,070.00 | | 1,070.00 |
HEATING & GAS | ||||
1 | 400,000 BTU Heater (natural gas) - Purchaser may have to upgrade gas meter/ANY UPGRADE IS AT PURCHASER'S EXPENSE | 4,362.93 | | 4,362.93 |
1 | Tucson Gas base (up to 20' run) | 1,330.00 | | 1,330.00 |
45 | Additional Gas line (Per Foot) over 20' - Tucson | 23.30 | | 1,048.50 |
1 | SPECIALS AND DISCOUNTS | | | |
FREE | ||||
1 | FREE - Buy a pool/spa package and get a free IntelliFlo package upgrade | -1,145.51 | | -1,145.51 |
1 | FREE - Q360 Ultimate In-floor Cleaning System, (Base 14 Head System, extra heads, additional charge, Abyss and Eclipse included, no cleaner or unused head credit) | -3,364.50 | | -3,364.50 |
1 | FREE - Get one additional pool light, white or blue light run is additional | -588.44 | | -588.44 |
1/2 OFF | ||||
1 | 1/2 OFF - 400K Gas Heater with a purchase of an attached ground Spa with a pool: FREE! IF YOU SIGN BY 8/22/22 |