- Jul 20, 2021
- 31
- Pool Size
- 18000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-40
I'm replacing the mechanical timer for my pool equipment. The replacement model is a Tork 1109A-O. I have attached the below wiring diagrams.
I have my line and then will have two loads from the timer.
Load A: VS Pump. I want this to always be on. The pump has a schedule set in the control panel
Load B: SWG. I want this switched by the mechanical timer.
Pump: Pentair - EC-011028 230V
SWG: Pentair - EC-520555 - IC40
Based on the VS Pump being 230V would I have to use the DPST config?
If using the DPST config, would I wire the VS Pump to Terminal 1 (Hot) and then the neutral with the other neutrals in the wire nut?

I have my line and then will have two loads from the timer.
Load A: VS Pump. I want this to always be on. The pump has a schedule set in the control panel
Load B: SWG. I want this switched by the mechanical timer.
Pump: Pentair - EC-011028 230V
SWG: Pentair - EC-520555 - IC40
Based on the VS Pump being 230V would I have to use the DPST config?
If using the DPST config, would I wire the VS Pump to Terminal 1 (Hot) and then the neutral with the other neutrals in the wire nut?
