Moved from here
Having similar issues to a new pool plaster with blemishes. PB is thinking to empty and acid wash in the spring. I have to pay to refill.
They also mentioned winterizing with a PH of 7.2 over the winter. I have already closed and covered. Currently maintaining the pool and balancing levels TA and PH.
Any experience on what PH level pool should be at to do a acid wash with pool still filled over time instead of emptying and refilling pool?
Will plan on opening sometime in late April.
Having similar issues to a new pool plaster with blemishes. PB is thinking to empty and acid wash in the spring. I have to pay to refill.
They also mentioned winterizing with a PH of 7.2 over the winter. I have already closed and covered. Currently maintaining the pool and balancing levels TA and PH.
Any experience on what PH level pool should be at to do a acid wash with pool still filled over time instead of emptying and refilling pool?
Will plan on opening sometime in late April.