Hey guys. Got a closing question. This year I’m going to drain down below my returns before the guys come to close me.
My plan is spin my scale control and poly 40 a day before. Next day lower water to below returns using my bottom drain since the skimmers will be dry once water goes below them. Is it ok to have my top step and some plaster exposed if it’s sunny out till the next day when they come? They will be blowing out all my lines and putting the cover on pretty much.
Anything else seem out of place with me doing this. Trying to save them time waiting for the water to drain out cause now that I’m hard plumbed it takes longer cause I can’t full throttle my pump to push water out like I used to into the woods. It’s tied into my gutter system to the drains now. The pipe can’t handle the huge quick amount of water.
My plan is spin my scale control and poly 40 a day before. Next day lower water to below returns using my bottom drain since the skimmers will be dry once water goes below them. Is it ok to have my top step and some plaster exposed if it’s sunny out till the next day when they come? They will be blowing out all my lines and putting the cover on pretty much.
Anything else seem out of place with me doing this. Trying to save them time waiting for the water to drain out cause now that I’m hard plumbed it takes longer cause I can’t full throttle my pump to push water out like I used to into the woods. It’s tied into my gutter system to the drains now. The pipe can’t handle the huge quick amount of water.