Today marks day 406 since the hole was dug and it's been 4 weeks since Cantera Pools has been out here to finish up the final things. The concrete guy did come out to fill some decking cracks, but I contacted him and set up the repair.
We're still waiting on:
- ScreenLogic 2 -- to replace a defective EasyTouch remote control -- the front plastic is separating from the controller
- Footprints in the plaster -- Trebol Plaster left boot prints in the Quartzscapes finish -- PB says they can acid treat them
- Automatic pool filler -- PVC ball valve is leaking
- Spigot vacuum breaker -- requires replacement after installing the automatic pool filler PVC to the hose bib
- Pool chemicals in lieu of a pool test kit
- Acid washing blue pool plaster off spa wall
So who else had a pool project that just kept going (and going and going), and how long did your build take?
We're still waiting on:
- ScreenLogic 2 -- to replace a defective EasyTouch remote control -- the front plastic is separating from the controller
- Footprints in the plaster -- Trebol Plaster left boot prints in the Quartzscapes finish -- PB says they can acid treat them
- Automatic pool filler -- PVC ball valve is leaking
- Spigot vacuum breaker -- requires replacement after installing the automatic pool filler PVC to the hose bib
- Pool chemicals in lieu of a pool test kit
- Acid washing blue pool plaster off spa wall
So who else had a pool project that just kept going (and going and going), and how long did your build take?