I finally got all my concrete cut out and have full access to my pipes, which I am fully replacing. So far I have hand dug out a lot of sand around the outside of the shell. And I am about to go deep enough in two area's that have bulges to relieve the pressure and "hopefully" pop the walls back into shape. Anyhow I will need to have material brought in so I can fill things back up. I know sand isn't the best choice so I am wondering if I should use gravel to fill in the area's that I removed? Obviously I didn't remove the entire shell so it would be 1/2 and 1/2 if I did that (gravel 1/2 way down on top of sand). Good or bad idea? I also have some trenches I dug up around the pipes leading to and from the pool that need filled? What do you guys think?
OH and I talked to a local supplier and they said they have either “masonry or paver” sand...
Thanks!
Oh and since everyone loves pictures, here is my repair progress so far. I still need to dig A LOT more out this weekend and I get the bonus of 110 degree heat index.
Pool Journey - Album on Imgur
OH and I talked to a local supplier and they said they have either “masonry or paver” sand...
Thanks!
Oh and since everyone loves pictures, here is my repair progress so far. I still need to dig A LOT more out this weekend and I get the bonus of 110 degree heat index.
Pool Journey - Album on Imgur